SPECIFICATIONS
Applicable Models: See Product Details
Battery Capacity (mAh): 120
Battery Properties: Rechargeable Battery
Driving Position: Universal
Item ID: EQ25176
Major Material: PP
Operating Voltage: ≤36V
Origin: Guangdong,China
Power Mode: USB Charging
Rechargeable Battery: Lithium Battery-Polymer
Wireless Property: other wireless functions
Please be aware that this tracker does not come with a SIM card; you will need to purchase and install a SIM card that supports 2G signals for it to function. The accuracy of the location provided by this device depends on the number of signal base stations available; more base stations lead to more precise positioning, while fewer base stations result in greater positioning errors.
This device offers two ways to search and find locations. One option is complimentary. As per the guidelines, you can modify a text message and send it to the tracker's SIM card to get a text message with a location link. The other option necessitates a subscription and payment. This method involves downloading an app for usage. The steps for operation are illustrated in the main video. It is advisable to utilize the free version for searching and locating.
Valued customer, if you are unsure about how to operate this locator, we recommend viewing the video in the primary image. The video offers a comprehensive guide on the procedures for utilizing the locator.
We appreciate your selection of our products. This item is a worldwide GPS positioning device, commonly utilized for tracking vehicles, individuals, pets, and preventing loss. Please ensure to thoroughly review the instructions prior to using this device. 
Operating Instructions: 
1. Obtain a SIM card (the SIM card must be compatible with 2G signals) and ensure the device is powered on. 
2. Insert the SIM card; the device will automatically turn on, and after 10 seconds, it will enter standby mode.
3. Power Off - Remove the SIM card, and the device will turn off by itself. 4. Error Management - Verify if the SIM card is functioning properly; if the device has enough battery; if the GSM signal is present. Version Without Application SMS Command Functionality
Please be aware that this locator relies on signal base stations for positioning. The accuracy improves with a higher density of these stations; however, if only one station is present, there will be some degree of positioning error.
To use this locator, you must buy and install a SIM card. The SIM card compatible with this locator only works with 2G networks. There are two ways to query the location: one involves sending a message to the SIM card in the locator, which will respond with a location link via SMS at no cost. The other method requires downloading an app for queries, which requires a subscription fee.






يتم توصيل جميع طلباتنا خلال ٣-٧ أيام عمل، حسب موقعك. نوفر خدمة توصيل مجانية لجميع منتجاتنا.